Designed modular weekly governance board architecture
- Day: 2026-06-26
- Time: 12:05 to 12:15
- Project: Business
- Workspace: WP 1: Strategic / Growth & Development
- Status: Completed
- Priority: MEDIUM
- Assignee: Matías Nehuen Iglesias
- Tags: Weekly-Planning, Governance, Routines, Checklists, Workflow-Design, Obsidian
Description
Session Goal
Explore and formalize a weekly planning framework that treats the week as a governable surface rather than a task list, with a lightweight weekly sheet acting as an activation layer for routines and operational continuity.
Key Activities
- Proposed a territorial weekly board with layered structure: physical, functional, narrative, and governance layers.
- Refined the idea that the weekly sheet should trigger routines instead of embedding full checklists.
- Defined a three-level planning architecture:
- a minimal weekly sheet for high-value entry points,
- secondary manuals/runbooks for detailed procedures,
- supporting governance artifacts to keep the system navigable.
- Introduced route-based execution paths such as BOOT, MAINT, CLN-30, BODY, CARRY, CLOSE with minimal tick criteria and evidence requirements.
- Proposed a modular support stack: Weekly Board, Governance Map, Route Cards, and Digital Support Index to reduce cognitive load and preserve separation between navigation and execution.
Achievements
- Clarified the design principle that the weekly sheet is a control panel, not a repository of exhaustive tasks.
- Established a clearer distinction between entry points, routines, and manuals, improving maintainability and reducing friction.
- Identified implementation constraints: stable IDs, minimal columns, explicit done criteria, and a phased rollout.
- Strengthened the continuity model by making the weekly board a bridge from one week to the next, especially around carry-over and closeout.
Pending Tasks
- Translate the framework into a concrete template or Obsidian-ready artifact.
- Define the exact fields and IDs for each route card and support artifact.
- Specify the phased implementation sequence and test it against real weekly use.
- Validate whether the route set is complete or needs additional paths for edge cases.
Evidence
- source_file=2026-06-26.sessions.jsonl, line_number=4, event_count=0, session_id=43d1ac8cbf9fb785adf7395e03903d613a6716dd34037a9172478baed70f033c
- event_ids: []